24 / Public proof programme

Four milestones. No credibility by announcement.

This programme converts PactVerity's remaining diligence gaps into public, reproducible work. Every milestone stays open until the stated evidence exists.

Verified integrations0 / 3Independent auditPendingVerified customers0 claimed
Evidence gate:Applications, reviewer conversations, proposals and unpublished work are not integrations, audits, customers, partnerships or grant awards.

01 / Programme

Progress changes only when primary evidence passes.

Each milestone links to its public process, current status and acceptance boundary.

010 / 3 verified

Independent integrations

Working public repositories, real API calls, sample receipts and second-engineer reproduction are required.

Open evidence route

02Open; not audited

Security review

A reviewer must publish scope, method, findings, limitations and remediation status before an audit claim appears.

Open evidence route

03Open for proposals

Flagship pilot

One bounded real workflow must produce measurable evidence without exposing credentials or customer data.

Open evidence route

04No verified customers or revenue claimed

Demand evidence

Usage becomes traction only when repeat activity, identity boundaries and measurement methodology are disclosed.

Open evidence route

02 / Working documents

Download the exact scopes before making contact.

These are public working documents, not completed engagements or legal agreements.

Independent review scope

Threat model, receipt-engine controls, API boundaries, reporting requirements and acceptance evidence.

Download scope ↓

Flagship pilot specification

A 30-day measurable AI/API workflow with baseline, reproduction and case-study gates.

Download specification ↓

Investor diligence index

A disclosure checklist separating available evidence, owner-supplied documents and unresolved items.

Download index ↓

Solana grant working draft

A milestone-based application draft is available for review. It is not submitted, endorsed or awarded and still requires the owner's legal identity, entity, budget and acceptance of the submission terms.

Download grant draft ↓

03 / Build or review

Submit technical evidence through the existing registers.

The two forms write to separate review queues. Submission creates no commercial commitment or public verification claim.

Reference integration

Flagship pilot

Live proof

Inspect the sources, not the pitch.

Open Evidence Observatory